Skip to product information
1 of 2

Original 1964 New Idea Parts List P-175 No. 301 Husking Unit TB9

Original 1964 New Idea Parts List P-175 No. 301 Husking Unit TB9

Regular price $27.00 USD
Regular price Sale price $27.00 USD
Sale Sold out
Tax included.
See pics for condition.

Original 1964 New Idea Parts List P-175 No. 301 Husking Unit TB9

Setting Up Instructions
FOLLOW THESE INSTRUCTIONS CAREFULLY TO GET THE MACHINE
PROPERLY SET UP AND ADJUSTED.
HUSKING UNIT AND WAGON ELEVATOR
With the crated husking bed resting on its skids, remove all bundles and parts wired to the husking unit. Install both caster wheels while the husking unit is resting on the wood skid. See Fig. 1. Remove
the two tie bolts in the wood supporting frame. Then by using a hoist, carefully lower the front end of the husking unit.
CASTER WHEELS
JACKS
1957 MODELS & LATER WITH 1 3/8 P.T.O. 0510-PMA-1 1s req'd.
P301-58
S 0 6
Fig. 1
Fig. 1-Install the right caster wheel as illustrat-ed, the left caster wheel is installed in the same man-ner.
Fig. 2
Fig. 2-Install jacks as illustrated.
[If jacks
are not ordered with the machine, it will be necessary to support the front of the husking unit with a trestle or block.]
View full details