{"product_id":"1982-sukup-stir-up-owners-installation-operation-manual-v39-1","title":"1982 Sukup Stir-Up Owners Installation \u0026 Operation Manual V39-1","description":"See Pics for condition.\u003cbr\u003e\u003cbr\u003e1982 Sukup Stir-Up Owners Installation \u0026amp; Operation Manual V39-1\u003cbr\u003e\u003cbr\u003eTrack Installation\u003cbr\u003eNOTE: In many cases, the existing holes in top bin sheet may be used for mounting the track (steps Al-A5). However, in some cases, holes will not match and it will be necesd to drill holes to mount track (steps AAI-AA5).\u003cbr\u003eSPACER NUT\u003cbr\u003eA. FOR BINS WHERE EXISTING HOLES MATCH TRACK BRACKETS\u003cbr\u003eNOTE: Where holes are to be drilled in field, see Section AA.\u003cbr\u003e1. Insert 1 1\/4\" bolt in every other hole around top of bin (approximate 18\" spacing), for bins smaller than 30'\u003cbr\u003eFor bins 30' and larger, place bolts in\u003cbr\u003eevery hole (approximate 9\" spacing) except at seam.\u003cbr\u003eTighten 5\/16' spacer nuts onto boits. Figs. 1 and 2.\u003cbr\u003eLIl\/A\" BOLT\u003cbr\u003eTRACK\u003cbr\u003e2. Mount one length of track over bolts and place a second nut on each top bolt. Do not tighten at this time. Figs. 1 and 2.\u003cbr\u003eNOTE: On double bracketed track (30' and larger), a gap has been left to prevent interference between\u003cbr\u003e","brand":"None","offers":[{"title":"Default Title","offer_id":53855912132918,"sku":null,"price":27.0,"currency_code":"USD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0759\/4285\/4966\/files\/static-e480d724-67a7-4799-8534-27f420af8390_af55fcf4-85a6-4bb1-a3de-26821558dfe4.jpg?v=1774888955","url":"https:\/\/everydayephemera.co\/products\/1982-sukup-stir-up-owners-installation-operation-manual-v39-1","provider":"Everyday Ephemera","version":"1.0","type":"link"}